The power for CSX train Q380 has cut-off and left the consist behind on track 2 of the main. After clearing the interlocking, they'll move into the Belle Isle siding and leave the two CSX engines for to power an ethanol train that's tied down there. I'm assuming then (since I did'nt stay to watch the entire move) the "pumpkins" will move back out to the main, hook-up to the train they left behind and continue their trip to Selkirk. |