ABS main line (just to the left of image) with more earth moving in preparation for Bucyrus-Erie dragline crossing. |
Date:
12/5/2012 |
Location:
Brookwood, AL Map  |
Views:
404 |
Collection Of:

Rick D |
|
Author: Rick D
|
 |
Picture Categories: |
This picture is part of album: Alabama Southern Railroad (ABS) |