Rollout of Swiss EC250 high speed - low floor train
The EC250 is designed with high pressure protection to withstand the shock wave when entering the Gotthard Base Tunnel. Therefore this massive constrution of the drivers side window.
Date:
5/18/2017
Location:
Bussnang, CH
Views:
304
Collection Of:
Peider SwissTrip
Locomotives:
SBB 501(UNKNOWN)
Author:
Peider SwissTrip
Picture Categories:
This picture is part of album:
Rollout Swiss EC250 High Speed - Low Floor Train
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=4711172